|
|
|
|
|
|
Building Regs
The Building Regulations are grouped into ’approved documents' (A to P) according to subject. Architects and Chartered Surveyors base their designs around these requirements. The normal procedure is to produce drawings ( typically 1:50 or 1:100 scale) of the proposed works and submit them to your local council Building Control Department, where they will be checked for compliance. For larger projects you may be asked to obtain structural engineer’s calculations, so the Council can be sure the loads are adequately supported. some typical Local Authority BC guidance notes How to make An Application: Useful advice from Wigan Council B.Control
Download BUILDING REGS DOCUMENTS here
Part C: Site preparation and resistance to moisture Part E: Resistance to the passage of sound Part H: Drainage and waste disposal Part J: Combustion appliances and fuel storage systems Part K: Protection from falling, collision and impact Part L1A: Conservation of fuel and power - new dwellings Part L1B: Conservation of fuel and power - existing dwellings Part M: Access to and use of buildings Part N: Glazing - safety in relation to impact, opening and
|
Find the right...
|
HOME USEFUL LINKS Copyright Zennor Consultants All rights reserved |